1398 BAYVIEW AVE. UNIT 2

Bone Construction

This modern fourplex was built by BONE STRUCTURE using a modular steel framing system that produces 50% less waste than traditional construction techniques.

Completed in 2017 the suites in this building are bright and modern and each unit comes fully equiped with an EV charger for electric vehicles.
I have managed this building from its construction and although vacancies are rare. If you would like to be put on a waiting list should any become available in the future, please just drop me a line.
TOP